Temple Column Exterior Mock-up In Progress

Work has recently begun on the temple columns’ exterior mock-up, a design which will be used on the columns all around the temple.

In the image below you can see half the exterior mock-up as it goes around the main column structure. The final product will be made of two pieces which will wrap around the actual column and be joined together to completely encase it.

We are very happy with the design and effects of the mock-up. Once we are fully satisfied we will make the rubber molds and begin casting the column pieces in GRC (Glass Reinforced Concrete), after which work will commence to install them.

We are very excited about this new aspect of the interior finishing work that has begun and hope all the devotees are pleased with our progress.

Source: https://tovp.org/construction/temple-column-exterior-mock-progress/#utm_source=rss&utm_medium=rss&utm_campaign=temple-column-exterior-mock-progress

E-mail me when people leave their comments –

You need to be a member of ISKCON Desire Tree | IDT to add comments!

Join ISKCON Desire Tree | IDT